Saturday, December 27, 2025
TagsVertical drilling up to 36 meters was done to allow the workers to pass through the Silkyara Tunnel.

Tag: Vertical drilling up to 36 meters was done to allow the workers to pass through the Silkyara Tunnel.

Most Read